ALF PACK
Coverage on PLC, motors, and heating elements.
DHL dispatch within 24 hours for urgent parts.
Direct access to engineers, not just sales staff.
The system follows a 4-step automated cycle designed to minimize human error:
Bottles are conveyed via the stepless speed belt into position.
Package passes through the tunnel and is set by the super cooling fan.
Quality Management
Factory Verified
FAQ
Absolutely, we offer both OEM (Original Equipment Manufacturer) and ODM (Original Design Manufacturer) collaboration. Our professional team is adept at tailoring solutions to meet your specific requirements.
The minimum order quantity of different series of models is different. Please contact us for more information.